Guardrails completed
Guardrails for the walkway have been completed.
The back of our house |
The front of our house. The house for Brenda´s mom (the turquoise door) is in the background |
Now my family and guests can safely enter our house without having to pass through my brother-in-law's house.
Total cost for the materials and labor was $600 (U.S dollars).
If you would like to help us with the cost, a donation can be made at https://cten.org/missionary/bryanottoson/
Our 2 cats love the walkways. The come to our front door to get food and affection |
Missions website: https://cten.org/missionary/bryanottoson/
Comments
Post a Comment